This project removes a fish passage barrier─a concrete structure used to divert water from Coleman Creek for irrigation and replaces it with a side-channel diversion into a flume that controls diverted water through a fish screen and into the lead irrigation system technologies will install an automated three-gate system to manage the diversion, monitor flow through the flume, monitor and control a pump well, and control introduction of supplemental water into the system as required should flow in Coleman Creek get below certain minimums. The SCADA system will operate autonomously, providing a local display of project data.
You are here: Home / Irrigation / Irrigation Diversion Modification Project, Coleman Creek, Ellensburg, WA